Tank Farm Cut Water: Why the Oil Arrives at 1,000 mg/L and How to Bring It Below 100
Every refinery performs the same small operation several times a day: crude sitting in a storage tank is relieved of the water that settled beneath it. The water goes by several names — cut water, draw-off water, tank bottoms — and it is treated as a housekeeping detail until someone adds up what it contributes to the effluent plant.
Cut water treatment matters for two reasons that have nothing to do with housekeeping. It protects crude quality and tank integrity, and it is one of the cheapest places in a refinery to recover oil that would otherwise be discharged or burned.
Three pollutant families and where they come from
The load in tank farm cut water is oil, suspended solids and COD, and the three arrive by different routes. Pump cooling water from process units contributes the continuous baseline. Oil vapour condensate contributes the light ends, which are the fraction most likely to be lost to atmosphere if the water is simply sent to a pit. Washing water used on oil products and on oil vapour contributes the surfactants that turn free oil into emulsion.
The concentrations are not marginal. Cut water, especially from crude tanks, commonly carries 500-1,000 mg/L of oil, and COD sits at around 1,000 mg/L. Electric desalter effluent and oil-water separator effluent fall in the same band. A refinery discharging a few hundred cubic metres a day of this stream is discharging a tonne of oil a week, invisibly.
Four reasons the job is harder than it reads
- Separation is never complete. Crude and water are mixed hard inside the tank by filling, by thermal movement and by the draw itself. Residual water and solids in the product affect downstream unit performance, and residual oil in the water defeats the effluent plant.
- Conventional technology is expensive to run. Gravity settling, hydrocyclones and membrane separation all consume energy and, in the membrane case, chemicals for cleaning. None of them was designed for a stream that appears in batches.
- Safety sits alongside the process. Incomplete or delayed draw-off destabilises the pressure and temperature profile inside the tank. Treatment that cannot keep up with tank operations becomes an operational constraint, and operators respond by drawing when they can rather than when they should.
- Pollution is immediate. Cut water that bypasses treatment reaches soil, stormwater or the effluent plant at full strength. There is no slow accumulation and no early warning.
A two-vessel physical line
SINOKLE builds the answer from two units and a buffer tank. Cut water enters an oily water buffer first, which decouples the tank farm's batch behaviour from the treatment plant's continuous behaviour. From there it is pumped to a high-efficiency coalescing oil separator, where most of the free oil and suspended solids come out.
The partially treated water then flows into the CDFU cyclonic dissolved gas flotation unit for the second pass. CDFU uses micro and nano bubbles under swirl to lift the oil and fine solids that coalescence alone cannot reach, and the oil content of the effluent drops below 100 mg/L. Downstream units take the water from there, and after advanced treatment it is discharged up to standard.
The combination works because the two vessels do different jobs. Coalescence is efficient at turning small droplets into large ones but needs somewhere for the large ones to go; flotation is efficient at lifting droplets but wasteful if it has to handle free oil that could have been skimmed. Running coalescence first means the flotation cell only deals with the hard fraction.
What changes at the battery limit
- Removal efficiency above 95% across oil and solids, which is what allows a single line to cover a stream whose strength varies by batch.
- No chemical dosing. Demulsification and de-oiling are physical, so sludge volume falls and disposal cost falls with it. There is also no secondary pollution from an overdosed coagulant.
- Skid-mounted footprint. A compact integrated unit instead of a concrete settling basin, which matters in tank farms where the available plot is often the space between two existing tanks.
- Shock resistance. The system adapts to large swings in water quality, which is the defining characteristic of cut water as opposed to process wastewater.
- Recovered oil goes back to the crude tank. This is the advantage that pays for the installation: the oil is not waste, it is inventory that was about to be lost.
- Automation. Skid-mounted equipment with automated control and online installation shortens the construction period and cuts the labour needed to run it.
Commissioning note from a Sichuan terminal
The unit installed at a refinery tank farm in Sichuan was commissioned inside the existing plot, with tie-ins made on live tanks. What the operators noticed first was not the effluent quality but the behaviour of the draw-off schedule: because the treatment line could absorb a full tank of bottoms in a shift, draw-off stopped being something to defer.
That is the real return on a cut water project. Compliance is the entry ticket; the operating benefit is a tank farm that can be run on its own schedule instead of around a bottleneck.